Stage Payments for Off-Plan Property Spain: How They Work
Buying Guide11 min read

Stage Payments for Off-Plan Property Spain: How They Work

New Build Homes Costa Blanca6 February 2026
Quick Answer

Stage payments for off-plan Spanish properties are structured installments tied to construction milestones. Typically: reservation 3%, contract signing 27%, construction stages 30-40%, and completion 30%. All payments are protected by bank guarantees under Ley 57/1968, ensuring refunds if the developer fails.

Purchasing an off-plan property in Spain involves a unique financial structure called stage payments. Unlike buying a completed property where you typically pay the full amount at completion, off-plan purchases are divided into several installments paid at different construction stages. This system protects both buyers and developers while spreading the financial burden across the building timeline.

Understanding how stage payments work is crucial for anyone investing in new-build property in Spain. The payment structure, legal protections, and timing can significantly impact your investment strategy and financial planning. This comprehensive guide explains everything you need to know about stage payments, from the initial reservation to final completion, including how to negotiate terms and protect your interests.

Whether you're a first-time buyer or an experienced property investor, knowing the ins and outs of Spanish stage payment systems will help you make informed decisions and avoid costly mistakes. We'll explore typical payment schedules, legal protections, bank guarantee requirements, and practical strategies for managing your payments throughout the construction period.

What Are Stage Payments?

Stage payments, known as "pagos por fases" in Spanish, are installment payments made throughout the construction process of an off-plan property. Rather than paying the entire purchase price at completion, buyers make periodic payments as the property reaches specific construction milestones. Each payment is typically linked to a defined stage of construction, from foundation work to handover.

This payment structure originated from the practical needs of property development. Developers require cash flow to fund construction materials, labor, and project management. Simultaneously, buyers benefit from paying only as the property is built, rather than providing the entire capital upfront. Stage payments create a balanced arrangement that has become the standard practice in Spain's property market.

The key principle is that payments are conditional on construction progress. If a developer fails to reach a specified milestone, technically the payment can be delayed. In practice, contractual obligations usually require developers to maintain the construction schedule or face financial penalties. This milestone-based approach provides buyers with a form of security and ensures they're paying for work actually completed.

The system is particularly attractive for international buyers who may want to stagger their investments over time, making it financially easier to purchase property abroad. Payment schedules can span from 3 to 4 years, depending on the project's scope and construction timeline.

Typical Payment Schedule Breakdown

Spanish off-plan property purchases follow a fairly standardized payment structure, though individual developers may negotiate variations. Understanding the typical breakdown helps you anticipate costs and plan your finances accordingly.

Reservation Fee (3-5%): The initial payment is made when you express interest and select the property. This reservation fee typically amounts to 3-5% of the purchase price and secures your choice of unit within the development. For a €300,000 property, this would mean €9,000 to €15,000. The reservation is usually non-refundable if you withdraw, but it's held in escrow and credited toward later payments if you proceed.

Contract Signature Payment (22-30%): When you sign the formal purchase contract (escritura de compraventa), a substantial payment becomes due. This typically represents 22-30% of the total price. For our €300,000 example, this would be €66,000 to €90,000. This payment demonstrates your commitment and funds the beginning of site preparation and foundation work.

Construction Stage Payments (30-40%): The majority of payments occur during the construction phases. These are divided into several installments (typically 3-5) coinciding with major construction milestones: foundation completion, structure completion, weather-tight envelope, interior work, and final installations. Each stage payment represents 6-10% of the purchase price. For a €300,000 property, expect €18,000 to €30,000 per construction stage payment.

Final Completion Payment (20-30%): The final installment, representing 20-30% of the purchase price, is due when the property is substantially complete and ready for handover. For our €300,000 example, this would be €60,000 to €90,000. This payment is often made simultaneously with the signing of the final completion certificate (certificado de conclusión).

Example Payment Schedule for €300,000 Property:

Reservation (3%): €9,000
Contract Signing (27%): €81,000
Foundation Complete (7%): €21,000
Structure Complete (8%): €24,000
Envelope Sealed (8%): €24,000
Interior Work (8%): €24,000
Final Installations (7%): €21,000
Completion (25%): €75,000
Total: €279,000 (plus VAT/IVA of 10% = €300,000)

The exact percentages may vary by developer and project, but this structure is representative of current market practice. Some developers may weight payments more heavily toward the beginning, requiring a larger contract signature payment to accelerate fundraising for construction. Others might balance payments more evenly across construction stages.

How Bank Guarantees Work in Practice

Understanding the mechanics of bank guarantees helps you know what protections you actually have and how to access them if needed.

Issuance Process: When you sign the purchase contract, the developer must provide a bank guarantee within 10 days of the contract being signed. The guarantee document specifies:

The guaranteeing bank and guarantee amount
The payment stages covered
The conditions under which the guarantee can be claimed
The claim procedure and timeline
The guarantee validity period

The buyer receives a copy of the guarantee documentation for their records. You should request and retain copies of all guarantee documents throughout your ownership period.

Coverage Details: The guarantee typically covers:

All stage payments made in advance of completion
Applicable VAT (IVA) on those payments
Interest calculated from the date of default
Reasonable costs associated with making a claim

The guarantee does NOT typically cover:

Payments made after keys are handed over
Costs of alternative accommodation during delays
Fluctuations in property value
Legal fees for pursuing non-payment claims

Making a Claim: If a developer fails to complete construction or becomes insolvent, you can claim against the bank guarantee by:

1Providing documentation proving your payment (bank statements, receipts)
2Demonstrating that the developer has failed to meet contractual obligations
3Submitting a formal claim to the guaranteeing bank
4Providing the signed purchase contract and bank guarantee documents

The bank then has a specified period (typically 30-60 days) to investigate the claim and make payment.

Example Scenario: Imagine you've paid €120,000 in stage payments on a €300,000 property when the developer becomes insolvent. The bank guarantee covers 90% of your payments (€108,000). You submit a claim with documentation showing your payments and the developer's failure to continue construction. The bank investigates within 45 days and reimburses you €108,000, recovering most of your investment. The remaining €12,000 (10% uncovered) may be recoverable through insolvency proceedings, though this is often difficult.

Duration: The bank guarantee typically remains in force from the contract signature until 3-6 months after the completion date. This period covers potential issues discovered after handover, such as undisclosed defects or incomplete work.

What Happens If the Developer Fails

While bank guarantees provide significant protection, it's prudent to understand what happens when a developer defaults and how the recovery process works.

Developer Insolvency: If a developer becomes insolvent during construction, the automatic consequence is that work stops. In this scenario:

Subcontractors and suppliers may abandon the site
The property remains incomplete
Buyers face uncertainty about whether construction will resume
Bank guarantees become the primary protection mechanism

Court Intervention: In cases of developer insolvency or abandonment, Spanish courts typically become involved:

An administrator is appointed to manage the developer's assets
Creditors (including buyers) can file claims
Assets are liquidated to satisfy claims in order of priority
Buyers with bank guarantees rank higher in priority than unsecured creditors

The Guarantee Claim Process: To recover funds through a bank guarantee:

1Notification: Inform the guaranteeing bank in writing of the default
2Documentation: Submit proof of payment (bank statements, receipts) and evidence of non-completion
3Investigation: The bank investigates (typically 30-60 days)
4Payment: If approved, the bank reimburses the guaranteed amount
5Recovery: Alternatively, you may pursue additional recovery through court proceedings

Partial Recovery: In most cases, bank guarantees reimburse 90% of your payments. The remaining 10% typically becomes a claim in the developer's insolvency proceedings. You may recover this 10% eventually, but it could take years and require significant costs for legal representation.

Time Considerations: The entire process from default to full reimbursement can take several months to a year. During this time:

Your money is tied up
You cannot complete your property purchase
You may need alternative accommodation if planning to move
You may face additional costs for legal advice and claim processing

Prevention Strategies: To minimize risk of developer failure:

Research the developer's track record and financial stability
Verify that all bank guarantee documentation is properly issued
Monitor construction progress against the agreed schedule
Ensure your lawyer reviews all legal documentation
Consider using an escrow service for payments
Maintain detailed records of all payments and communications

Recent Examples: The Spanish property market has experienced several high-profile developer failures, particularly during the 2008-2015 financial crisis. While the implementation of Ley 57/1968 protections has significantly reduced losses to buyers, some developments remain incomplete. Buyers who made payments with proper bank guarantees recovered most of their investments, while those without guarantees often suffered total losses.

Payment Methods and Currency Considerations

Managing payments for off-plan property purchases involves practical decisions about how to transfer money internationally and what currency to use.

Accepted Payment Methods: Most Spanish developers accept:

Bank transfers (SWIFT transfers for international payments)
Bank checks drawn on Spanish banks
Direct bank-to-bank transfers via Spanish banking system
Occasionally, bankers' drafts
Less commonly, checks drawn on foreign banks (though these take longer to clear)

Developers typically do not accept credit cards, personal checks, or cryptocurrency due to legal and tax reporting requirements. All payments must be traceable and documented for legal protection.

International Payments: If you're paying from outside Spain:

1SWIFT Transfers: Use your bank's SWIFT transfer service to send payments directly to the developer's Spanish bank account. This is the most reliable method.
2Exchange Rates: You'll pay the current exchange rate when the transfer is processed. The rate depends on your bank's current rates, which may be less favorable than market rates.
3Transfer Costs: Expect to pay international transfer fees (typically €15-50 per transfer), though some banks offer fee waivers.
4Processing Time: International transfers typically take 3-5 business days to arrive.
5Timing: Some buyers arrange transfers to arrive just before payment due dates to minimize currency risk.

Currency Considerations: Since Spain uses the Euro:

All property prices and payments are quoted in Euros
You cannot negotiate to pay in your home currency
Exchange rate fluctuations affect your total investment cost
If paying from a non-Euro country, you absorb exchange rate risk

Example Currency Impact: A €300,000 property costs:

At GBP 0.87/EUR: £261,000 (if paying from UK)
At USD 1.09/EUR: $327,000 (if paying from US)
If exchange rates move 5% unfavorably, your cost increases by €15,000

Risk Management: To manage currency risk:

Time payments to coincide with favorable exchange rates
Use international money transfer specialists offering better rates than banks
Consider fixed-rate forward contracts to lock in exchange rates months in advance
Spread large payments across multiple transfers to average the exchange rate
Consult a financial advisor about optimal payment timing and currency strategies

Tax Reporting: Large international payments may trigger tax reporting requirements:

In the US, transfers over $10,000 must be reported
The UK requires disclosure of overseas accounts over £100,000
Spain requires foreign buyers to declare the property and all associated transactions
Your accountant should be informed of all payment dates and amounts for tax reporting

Escrow Services: Some international property platforms offer escrow services that:

Hold your funds in a secure account
Release payments only when contractual milestones are met
Provide currency conversion at competitive rates
Document all transactions for tax purposes

These services typically charge 1-2% but provide peace of mind and better rates than direct bank transfers.

Linking Payments to Construction Milestones

The most important aspect of stage payments is that they should be tied to actual construction progress. Understanding how to define and verify milestones protects you from paying for work not completed.

Defining Construction Milestones: Your purchase contract should specify exactly what construction work must be completed before each payment is due. Clear, measurable milestones might include:

Stage 1 - Foundation Work (7%):

Site cleared and leveled
Perimeter temporary fencing installed
Foundations excavated to specified depth
Reinforcement steel placed
Foundation concrete poured and cured
Site drainage installed

Stage 2 - Structure (8%):

Concrete frame completed to roof level
Internal partition walls constructed
Roof structure installed and weatherproofed
External walls substantially complete
Windows and external doors installed
Building is weather-tight

Stage 3 - Envelope Sealed (8%):

All external openings sealed
Roof covering fully installed
Damp-proof courses installed
External scaffolding removed
External rendering/finishing applied
Exterior lighting installed

Stage 4 - Interior Work (8%):

Electrical rough-in completed
Plumbing rough-in completed
Internal walls dry-lined
Partition walls finished
Flooring substrate installed
Internal doors installed

Stage 5 - Final (7%):

Electrical wiring completed and tested
Plumbing completed and tested
Kitchens and bathrooms fitted
Flooring finished
Interior painting complete
Lighting and switches installed

Verification Process: Before making each payment, you should:

1Review Contract: Confirm the exact milestone requirements
2Site Visit: Personally inspect the property or have a qualified surveyor inspect it
3Photo Documentation: Take photographs showing progress
4Comparison: Compare actual condition to contract specifications
5Documentation: Obtain signed progress reports from the developer or surveyor
6Approval: Only authorize payment when you're satisfied the milestone is met

Withholding Payment: If construction is behind schedule or milestones are not met:

You have the right to withhold payment
The contract typically allows 10-15 days to cure defects
If defects aren't remedied, you can formally dispute the payment
Bank guarantees protect you if disputes escalate to default

Dispute Resolution: If there's disagreement about whether a milestone is complete:

Request an independent surveyor's report
Refer to the detailed milestone descriptions in the contract
Engage your lawyer to formally communicate concerns
Some contracts include arbitration clauses for milestone disputes

Practical Example: You're scheduled to make a €24,000 payment (8%) when "the structure is complete." You visit the site and find:

The concrete frame is complete
The roof structure is installed
Windows are installed
However, external rendering has not started
The building is not yet completely weather-tight

In this case, you can:

1Request the developer confirm when external rendering will be complete
2Hold the payment pending completion of the envelope
3Formally notify the developer in writing that the milestone is incomplete
4Allow 10-15 days for remedy (per typical contract terms)
5Release payment once the building is truly weather-tight

Red Flags: Be concerned if:

The developer insists on payment despite incomplete work
Progress is significantly behind schedule
The developer refuses site access for inspection
Quality appears to be deteriorating
The developer is slow to respond to progress inquiries

Negotiating Payment Terms

While standard payment schedules are common, they're not always fixed in stone. Many developers will negotiate terms, particularly for larger purchases or multiple properties.

Areas for Negotiation:

Payment Percentages: You might negotiate to:

Reduce the initial reservation fee (perhaps from 5% to 3%)
Delay when the largest payments are due
Lower the deposit due at contract signing
Increase payments due at later stages

Developers typically prefer front-loaded payments to improve cash flow, but they may negotiate for market competitiveness if other developments offer better terms.

Payment Timeline: You could request:

Longer periods between payment stages (e.g., 6 months instead of 4 months)
Payments due quarterly instead of every stage completion
Final payment deferred 3-6 months after handover pending final inspections
Grace periods during construction delays

Milestone Flexibility: Negotiate:

Clearly defined, objective milestone criteria
Right to conduct independent inspections before payment
Ability to withhold payment if milestones aren't met
Clear dispute resolution processes
Penalties if the developer delays beyond agreed schedules

Price Adjustments: Possibly negotiate:

Fixed pricing with no adjustment for inflation or material cost increases
Currency-locked pricing if paying from outside the Eurozone
Price reductions for earlier payment (sometimes developers offer 1-2% discounts for front-loading payments)

Bank Guarantee Terms: Request:

Extended guarantee periods (some developers offer 1-year guarantees post-completion)
Guarantees that increase if schedules slip
Coverage of 100% rather than 90% of payments
Guarantees from major banks with strong credit ratings

Negotiation Strategies:

1Early Negotiation: Begin discussions during the initial purchase phase, before contracts are signed. Once contracts are signed, the developer has little incentive to renegotiate.
2Volume Leverage: If purchasing multiple units or bringing other buyers, use this as leverage. Developers value reliable bulk buyers.
3Market Conditions: In slower markets, developers are more willing to negotiate favorable terms. In hot markets with high demand, they have less incentive.
4Reasonable Requests: Focus on terms that seem unfavorable rather than trying to entirely redesign the payment structure. Developers won't accept terms that jeopardize their project financing.
5Professional Representation: Use your lawyer to present requests professionally and incorporate negotiated terms into formal contracts.
6Written Confirmation: Ensure all negotiations are documented in writing and incorporated into the final purchase contract. Verbal agreements may not be enforceable.

Negotiation Example: Standard terms call for 5% reservation, 27% at contract, then stages. You negotiate:

Reservation reduced to 3% (€9,000 saved on €300,000 property)
Contract payment reduced to 25% with first stage brought forward
Final payment deferred 3 months pending completion inspection
Bank guarantee extended to 12 months post-completion
Milestone definitions made more specific and verifiable

These changes reduce your early financial burden and improve your protection. The developer accepts because they still receive substantial upfront capital and the changes don't threaten project financing.

When Not to Negotiate: Some developers operating in competitive markets or high-demand areas won't negotiate. Accept this reality rather than making unreasonable demands that cost you the property. Focus negotiations on terms that genuinely matter to your situation.

Mortgages and Stage Payments

Most buyers finance off-plan property purchases with mortgages, which interact with stage payment schedules in important ways.

How Mortgages and Stage Payments Interact:

When you obtain a mortgage to purchase off-plan property:

The lender issues funds to the developer in stages matching construction progress
Each payment the developer receives is a separate loan drawdown
The mortgage is secured against the property (even in its incomplete state)
The lender retains the mortgage deed until final payment and title transfer

Staged Mortgage Disbursement: Rather than providing all mortgage funds upfront, lenders follow the payment schedule:

Month 0: Lender provides 3% (reservation money)
Month 1: Lender provides 27% (contract signing funds)
Month 4: Lender provides 7% (foundation complete)
Month 8: Lender provides 8% (structure complete)
Month 12: Lender provides 8% (envelope sealed)
Month 16: Lender provides 8% (interior work)
Month 20: Lender provides 7% (final stage)
Month 24: Lender provides 25% (completion)

You're typically responsible for paying mortgage interest on each drawdown from the date it's disbursed, not from the date you sign the mortgage. This is called "drawdown interest."

Interest Accrual: On a €300,000 mortgage at 3.5% interest:

Month 0: Interest begins accruing on €9,000
Month 1: Interest accrues on €90,000
Month 4: Interest accrues on €111,000 (7% more)
By completion: Interest has accumulated for 24 months across all drawdowns

Total drawdown interest might be €10,500-€12,000 over the construction period, depending on exact payment dates and interest rate timing.

Mortgage Approval Process:

1Pre-Approval: Lenders pre-approve you for the loan amount, typically based on the full purchase price.
2Valuation: The lender has the off-plan property independently valued. Construction-stage properties present valuation challenges—lenders typically use conservative valuations based on 60-80% of estimated final value.
3LTV Ratio: Lenders assess the loan-to-value ratio. For off-plan property, they might offer 60-80% of the estimated completion value, depending on the development's reputation and location.
4Drawdown Requests: You or your lawyer requests mortgage drawdowns as construction stages are completed. The lender typically requires:
Evidence of the stage completion (photos, surveyor's report)
Proof that the development is progressing on schedule
Verification that no competing claims exist on the property
Confirmation from the developer that the payment stage is due
5Drawdown Processing: Once approved, lenders typically process drawdowns within 5-10 business days.

Mortgage Issues with Off-Plan Property:

Valuation Problems: Some lenders struggle to value incomplete properties. They may:

Require reduced loan-to-value ratios (60% instead of 80%)
Demand higher deposits from you
Impose higher interest rates
Conduct multiple valuations during construction

Schedule Delays: If construction falls behind, mortgage drawdown timing may not align with payment requirements. The developer still expects payment, but your mortgage lender hasn't released funds yet. You'll need bridge financing or additional funds to cover the gap.

Lender Concerns: Lenders assess developer stability. If they doubt the developer will complete the project, they may:

Decline to finance the purchase
Require enhanced security or guarantees
Insist on reserve funds held in escrow
Demand personal guarantees

Example Scenario: You purchase a €300,000 property with an 80% mortgage (€240,000) and must provide €60,000 in personal funds:

Reservation (3% = €9,000): You pay from personal funds
Contract (27% = €81,000): Mortgage provides €64,800; you pay €16,200 from personal funds
Subsequent stages: Mortgage provides proportional amounts; you contribute remaining funds

If you lack sufficient personal funds to cover the gap between payments due and mortgage drawdowns, you'll need alternative financing (savings, loans, or bridge financing).

Timing Considerations:

Large lenders may take 3-5 days to process drawdown requests
Smaller regional banks may process faster
Developers may require payment days before lenders can release funds
You may need to temporarily cover gaps with personal funds, then replenish them when mortgage funds arrive

Currency Considerations: If borrowing in your home currency but making payments in Euros:

Your mortgage amount is typically fixed in your home currency
Payment requirements are fixed in Euros
Exchange rate fluctuations affect your effective mortgage amount
You should monitor exchange rates and consider hedging strategies

Mortgage Advice: When obtaining a mortgage for off-plan property:

Inform your lender immediately that the property is off-plan
Request written confirmation they'll provide staged drawdowns matching the payment schedule
Ask about their valuation methodology for incomplete properties
Clarify exactly when they'll release funds relative to your payment obligations
Consider slightly higher personal reserves (€10,000-€15,000) to cover timing gaps
Maintain a savings buffer for potential drawdown delays

Example Payment Schedules with Actual Figures

Concrete examples help illustrate how stage payments work in practice. Below are realistic scenarios for properties at different price points.

Example 1: €300,000 Mid-Range Apartment, Costa Blanca

Property: 2-bedroom apartment Total Price: €300,000 (including 10% IVA/VAT) Base Price: €272,727 VAT (10%): €27,273

Payment Schedule (typical monthly timeline):

| Stage | Description | Percentage | Amount (€) | Cumulative (€) | Timing | |-------|-------------|-----------|-----------|----------------|--------| | 0 | Reservation | 3% | 9,000 | 9,000 | Upon agreement | | 1 | Contract Signature | 27% | 81,000 | 90,000 | Month 1 | | 2 | Foundation Complete | 7% | 21,000 | 111,000 | Month 4 | | 3 | Structure Complete | 8% | 24,000 | 135,000 | Month 8 | | 4 | Envelope Sealed | 8% | 24,000 | 159,000 | Month 12 | | 5 | Interior Complete | 8% | 24,000 | 183,000 | Month 16 | | 6 | Final Installations | 7% | 21,000 | 204,000 | Month 20 | | 7 | Completion | 25% | 75,000 | 279,000 | Month 24 | | | VAT (payable at completion) | | 27,273 | 306,273 | Month 24 |

Financing (80% mortgage + 20% personal funds):

Mortgage amount: €240,000
Personal contribution: €66,273

Mortgage Drawdowns at 3.5% interest (annual rate):

Month 0-1: €9,000 + €72,000 = €81,000 (lender provides €64,800; you pay €16,200)
Month 4: €21,000 (lender provides entire amount)
Month 8: €24,000 (lender provides entire amount)
Month 12: €24,000 (lender provides entire amount)
Month 16: €24,000 (lender provides entire amount)
Month 20: €21,000 (lender provides entire amount)
Month 24: €75,000 + VAT €27,273 = €102,273 (lender provides final amount)

Drawdown interest (approximate): €9,500

Total cost to you: €306,273 (property) + €9,500 (drawdown interest) + mortgage interest on €240,000 = approximately €306,273 + significant mortgage interest depending on total loan period

Example 2: €500,000 Premium Villa, Alicante Province

Property: 4-bedroom villa with pool Total Price: €500,000 (including VAT) Base Price: €454,545 VAT (10%): €45,455

Payment Schedule:

| Stage | Description | Percentage | Amount (€) | Timing | |-------|-------------|-----------|-----------|--------| | 0 | Reservation | 3% | 15,000 | Upon agreement | | 1 | Contract | 25% | 125,000 | Month 1 | | 2 | Foundation Complete | 6% | 30,000 | Month 4 | | 3 | Structure Complete | 8% | 40,000 | Month 8 | | 4 | Roof & Envelope | 8% | 40,000 | Month 12 | | 5 | Internal Walls | 8% | 40,000 | Month 16 | | 6 | Systems & Finishes | 8% | 40,000 | Month 20 | | 7 | Final Completion | 24% | 120,000 | Month 26 | | | VAT (at completion) | | 45,455 | Month 26 |

Financing (70% mortgage + 30% personal funds for premium property):

Mortgage: €350,000
Personal contribution: €150,000
Example 3: €150,000 Budget Apartment, Inland Murcia

Property: 1-bedroom apartment Total Price: €150,000 (including VAT) Base Price: €136,364 VAT (10%): €13,636

Payment Schedule:

| Stage | Description | Amount (€) | Timing | |-------|-------------|-----------|--------| | Reservation | | 4,500 | Upon agreement | | Contract | | 40,500 | Month 1 | | Foundation | | 10,500 | Month 4 | | Structure | | 12,000 | Month 8 | | Envelope | | 12,000 | Month 12 | | Interior | | 12,000 | Month 16 | | Final | | 10,500 | Month 20 | | Completion | | 36,000 | Month 24 | | VAT | | 13,636 | Month 24 |

Financing (85% mortgage + 15% personal funds):

Mortgage: €127,500
Personal contribution: €22,500

Comparison Across Examples:

The payment structure is consistent across price points, but personal contribution requirements vary:

€300,000 property: 20% personal = €60,000
€500,000 property: 30% personal = €150,000
€150,000 property: 15% personal = €22,500

More expensive properties typically require higher personal contributions due to lender concerns about valuing incomplete luxury properties.

Currency Impact Example:

For UK buyer purchasing €300,000 property:

At GBP/EUR 0.85: Cost is £255,000
At GBP/EUR 0.90: Cost is £270,000
5% exchange rate movement = £15,000 difference

Payments spread over 24 months experience averaging, but early large payments can significantly impact total cost if exchange rates move adversely.

Tax Considerations:

VAT (IVA in Spain) is typically 10% on new property. Some developments are zero-rated if they meet specific criteria (certain categories of housing). Always confirm VAT treatment with your legal advisor and factor it into total cost calculations.

Key Takeaways and Best Practices

Understanding stage payments is essential for successful off-plan property investment in Spain. Here are the critical points to remember:

Payment Structure: Expect stage payments following a pattern of 3% reservation, 25-27% at contract, 30-40% during construction stages, and 20-30% at completion. Exact percentages vary by developer and may be negotiable.

Legal Protection: Ley 57/1968 requires 90% of each payment to be covered by bank guarantees. Verify that all guarantee documentation is properly issued and maintained throughout the construction period.

Milestone Verification: Always confirm that contracted milestones are objectively defined and completed before releasing payment. Retain the right to withhold payment if construction hasn't reached the agreed stage.

Documentation: Keep meticulous records of all payments, bank guarantee documents, contracts, and construction progress photos. These documents protect you if disputes arise.

Professional Advice: Engage a qualified Spanish property lawyer before signing any contracts. They'll ensure your interests are protected and terms are negotiated favorably.

Currency Management: If paying from outside the Eurozone, monitor exchange rates and consider timing payments strategically or using forward contracts to manage currency risk.

Mortgage Coordination: If financing with a mortgage, ensure your lender understands the off-plan nature and will provide staged drawdowns matching the payment schedule. Maintain sufficient personal reserves to cover any timing gaps.

Developer Verification: Research the developer's track record, financial stability, and past projects. Developers with established reputations and completed projects provide greater security than new or unknown entities.

Contingency Planning: Budget additional reserves (5-10% of purchase price) for unexpected costs, delays, or currency fluctuations. Construction rarely proceeds exactly on schedule.

Regular Inspections: Schedule regular site visits or hire a surveyor to monitor progress. Familiarize yourself with the property's development and ensure work quality meets standards.

Insurance and Additional Costs: Remember that stage payments cover only the property structure. Budget separately for:

Property taxes and registration costs
Lawyer and notary fees
Community fees (if applicable)
Insurance
Utilities connection and setup
Furnishings and improvements

These additional costs can easily add 10-15% to your total property investment.

The Bottom Line

Stage payments represent the standard and sensible way to finance off-plan property purchases in Spain. By spreading payments across construction stages and protecting each payment with bank guarantees under Ley 57/1968, the system protects both buyers and developers while enabling access to new-build property. Understanding the mechanics of stage payments, verifying construction milestones, negotiating favorable terms, and maintaining rigorous documentation will help ensure your off-plan investment succeeds. Work with qualified professionals—lawyers, surveyors, and financial advisors—to navigate the process confidently. With proper planning and due diligence, purchasing off-plan property in Spain can be an excellent investment opportunity, providing modern construction, warranty protection, and favorable financing terms that completed property purchases cannot match. Ready to invest in your Spanish property? Contact us today for expert guidance on finding the right off-plan development and managing your stage payments professionally.

Interested in properties in this area? Book a free 30-minute consultation with our team — with over 12 years of experience, we'll help you find exactly what you're looking for.

Frequently Asked Questions

1Are stage payments mandatory when buying off-plan property in Spain?
Yes, stage payments are the standard and essentially mandatory practice for off-plan properties in Spain. The payment structure is required by law (Ley 57/1968) to be milestone-based and protected by bank guarantees. You cannot negotiate away the staged payment system itself, though you may negotiate the specific percentages and timing within that framework. Developers require stage payments to manage cash flow during construction, and the system protects buyers by ensuring you pay only as work is completed. Attempting to pay the entire amount upfront would violate standard market practice and legal protections.
2What if the developer is still building when the final payment is due?
If construction isn't complete by the final payment due date, you should withhold payment until completion. Your contract should specify that the final payment is due only upon substantial completion of the property and issuance of the completion certificate (certificado de conclusión). If the developer insists on payment despite incomplete work, you can formally dispute the payment through your lawyer. The bank guarantee protects you—if the developer doesn't complete, you can claim against the guarantee for reimbursement of any payments made. Minor deficiencies discovered at completion (paint touch-ups, small repairs) are typically remedied post-completion, but major structural or systems work must be finished before final payment. Many contracts allow withholding a percentage of the final payment (5-10%) until a final inspection confirms all work is complete.
3Can I lose my deposit if I change my mind about the property?
Generally yes, the reservation deposit (typically 3-5%) is non-refundable if you withdraw before signing the purchase contract. Once the contract is signed, if you withdraw, you may lose both the reservation and contract payment (typically 3-30% total). However, there are limited exceptions. If the developer materially breaches the contract—such as failing to meet major construction milestones or deviating significantly from approved plans—you may have grounds to withdraw and recover payments. Additionally, if your mortgage is refused after contract signing, some contracts include clauses allowing withdrawal without penalty. Always review contract terms carefully and ensure your lawyer explains the refund conditions and exceptions. Spanish law provides some consumer protections, but it's safer to assume deposits are non-refundable and only commit when you're certain.
4How do I verify construction progress before making each payment?
Before each payment, you should personally inspect the property or hire a qualified surveyor to verify construction progress. Your contract should specify measurable, objective milestone criteria (e.g., 'foundation concrete poured and cured,' not vague terms like 'foundation underway'). During site visits, compare the actual condition to the contract's milestone descriptions. Take photographs documenting progress and note any deviations from plans. Request a progress report signed by the developer's site manager confirming the milestone is complete. Consider hiring a professional surveyor for 2-3 critical inspections (foundation, structure completion, envelope sealed) rather than inspecting everything yourself. If progress doesn't match the contractual milestone, formally notify the developer in writing, allowing 10-15 days to remedy defects before withholding payment. Documentation (photos, emails, surveyor reports) proves your diligence if disputes arise later.
5What happens if exchange rates move significantly during construction?
If you're paying from outside the Eurozone, exchange rate fluctuations directly affect your total investment cost. A 5% unfavorable movement on a €300,000 property equals €15,000 in additional cost. You cannot change the payment amount (it's fixed in Euros), so exchange rate risk is yours. To manage this risk: (1) time large payments to coincide with favorable exchange rates; (2) use international money transfer specialists offering better rates than banks; (3) consider forward contracts locking in exchange rates months in advance; (4) spread large payments across multiple transfers to average the rate; (5) maintain some funds in Euros to reduce conversion needs. Some buyers fund Euro accounts gradually, averaging the exchange rate over time. Discuss currency strategy with a financial advisor familiar with property investment. While you can't eliminate exchange risk entirely, strategic timing and professional services can minimize its impact.
6Are bank guarantees always reliable, and can I claim against them easily?
Bank guarantees under Ley 57/1968 are highly reliable and come from reputable Spanish banks, making them far more secure than informal arrangements. However, they're not automatically paid—you must make a formal claim with proper documentation. The process involves: (1) collecting proof of payment (bank statements showing transfers to developer); (2) demonstrating developer default (failure to complete, insolvency, or breach); (3) submitting formal claim documents to the guaranteeing bank; (4) allowing 30-60 days for investigation. The bank verifies your claim before paying. Guarantees typically cover 90% of payments, not 100%, so you may lose 10%. The claim process is straightforward with proper documentation, but it takes time—expect 2-4 months from claim to reimbursement. Guarantees don't cover subjective disputes about milestone completion—they protect against developer failure. To ensure easy claiming, maintain all payment receipts, contracts, and correspondence with the developer. If disputes arise about milestone completion, resolve them before defaulting occurs, as clean documentation makes guarantee claims faster.
7Can I negotiate lower stage payments in exchange for paying interest to the developer?
This is not common practice and is generally inadvisable. Stage payments are tied to construction milestones for legal reasons under Ley 57/1968—they're designed to ensure you pay only as work is completed. Negotiating lower payments is possible (requesting 5% instead of 7% at a stage, for example), but you must still pay the full price eventually. Adding interest for delayed payment would increase your total cost and serves no real purpose since your mortgage already accrues interest. What you might legitimately negotiate is deferring payment timing (extending to month 6 instead of month 4 for a stage), which effectively gives you a short-term delay without formal interest. However, developers rarely accept this since it delays their cash flow. Your better strategy is to negotiate lower initial payments (reservation, contract) and higher final payments, reducing your early financial burden while keeping total cost constant.
8What additional costs should I budget beyond the stage payments?

Continue Reading

More guides to help you buy property in Spain

Buying Guide10 min read

Best Time to Buy Property in Spain

Best time Spain property: November-February lower prices (15-20% discount seasonal), developer year-end sales, spring viewing trips, summer completions. Avoid July-August peaks. Currency timing strategic.

Buying Guide14 min read

Buying Off-Plan Property in Spain: Complete 2026 Guide

Everything you need to know about buying new build property off-plan in Spain. Payment stages, legal protections, bank guarantees, and how to avoid common pitfalls.

Buying Guide12 min read

Buying Property in Spain: Step-by-Step Process 2026

Complete guide to the Spanish property buying process. From initial search to key handover - every step explained for international buyers.

Buying Guide10 min read

Javea vs Denia: Which Costa Blanca Town Is Right for You?

Choosing between Javea and Denia? Both are stunning Costa Blanca destinations with different vibes. Compare prices, lifestyle, amenities, and investment potential to find your perfect fit.

Buying Guide12 min read

Key Ready Properties in Costa Blanca: Completed New Builds 2026

Discover key ready properties in Costa Blanca—fully completed, inspected homes ready to move into immediately. Compare key ready vs off-plan vs resale, explore advantages and disadvantages, and find move-in ready properties across Torrevieja, Guardamar, Javea, and beyond.

Buying Guide13 min read

New Build vs Resale Spain: Pros, Cons & True Costs

New build vs resale property in Spain: compare stage payments, warranties, energy efficiency, IVA taxes, and total ownership costs.

Ready to Find Your New Build Home?

Book a free consultation with our property experts. We'll help you find the perfect property in Costa Blanca.

Ready to Find Your Dream Home?

Browse our selection of new build properties across Costa Blanca or contact us for personalized recommendations.